Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Preparation - G&D VisionXS-IP-C-DP-UHR Installation Und Bedienung

Vorschau ausblenden Andere Handbücher für VisionXS-IP-C-DP-UHR:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation

Installation

Preparation

IMPORTANT:
When choosing a location for the devices, please ensure to comply
with the ambient temperature limit (see (see Technical data on page 99 ff.)) close to
the device. The ambient temperature limit must not be influenced by other
devices.
Ensure sufficient air circulation.
IMPORTANT:
Do not cover the ventilation openings. For reasons of electric safety,
only upright, horizontal installation is permitted for devices with ventilation
openings. Vertical installation is only permitted with suitable device carriers from
G&D.
Please refrain from using devices with ventilation openings in dusty environ-
ments. Dust in the housing can damage the electronics and may cause failures.
1. Ensure that the computer to be connected to the computer module is switched
off. If the computer is provided with keyboard and mouse, unplug the cables of
the input devices from the interfaces.
2. Place the computer module (
NOTE:
Please mind the maximum cable length of two meters between the com-
puter module and the computer to be connected.
3. Place the console module (
NOTE:
Please mind the maximum cable length of two meters between the con-
sole module and the devices of the remote console.
4. Take the supplied cables and have them ready for the installation of the devices.
7 · G&D VisionXS-IP-C-DP-UHR
) close to the computer.
VisionXS-IP-CPU
VisionXS-IP-CON
) close to the remote console.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis