Scope of delivery

Check the grinding machine immediately after delivery for transport damage, missing parts and
loose locking bolts. Compare the scope of delivery with the delivery note. Grinding wheels are
available in specialist shops or from our main catalogue.
3.3
Storage
ATTENTION!
Incorrect and improper storage might result in damage or destruction of electrical and
mechanical machine components.
Store packed and unpacked parts only under the intended environmental conditions.
Follow the instructions and information on the transport box.
Consult Optimum Maschinen Germany GmbH if the machine and accessories are stored for
more than three months or are stored under different environmental conditions than those spec-
ified here.
3.4

Set-up and assembly

3.4.1

Installation site requirements

Organise the working area around the grinding machine according to the local safety regula-
tions.
WARNING!
The grinding machine must be firmly connected to the substructure.
CAUTION!
Arrange the machine's connection cable in such a way that it will not cause a tripping
hazard.
INFORMATION
In order to achieve high levels of functionality and machining accuracy, as well as a long ser-
vice life of the machine, the set-up location should meet certain criteria.
The following points should be noted:
The device must only be installed and operated in a dry and well-ventilated place.
Avoid places close to machines which cause chips or dust.
The installation site must be vibration-free, i.e. located away from presses, planing
machines, etc.
The foundation must be suitable for the grinding machine. Also make sure that the floor has
sufficient load bearing capacity and is level.
The floor must be prepared in such a way as to ensure that, if any coolant is used, it cannot
penetrate the floor.
Protruding parts - such as the dog, handles, etc. - must be secured, where necessary, by
means of on-site measures so that persons are not endangered.
Provide enough space for set-up and operating personnel and material transport.
Also bear in mind accessibility for installation and maintenance works.
Ensure adequate lighting is available (minimum value: 500 Lux, measured at the tool tip). In
the event of a lower level of lighting, additional illumination must be provided, e.g. by means
of a separate workplace light.
The power plug of the grinding machine must be readily accessible.
Delivery, interdepartmental transport and unpacking
Version 1.0.2 - 2021-3-9
Translation of original instruction
GU30
GB
29

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

3101530

Inhaltsverzeichnis