Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting And Installation; Mounting In A 19" Rack - axing MIE 8-00 Betriebsanleitung

Chp - compact high performance kopfstellen
Vorschau ausblenden Andere Handbücher für MIE 8-00:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operation instructions | MIE 8-00 | MIE 16-00 | MIE 32-00 | MIE 4-02 | MIE 8-02 | MIE 3-02 | MIE 6-02

2. Mounting and Installation

 Installation must be performed by authorized and skilled electricians only.
 Before mounting and installation, pull the mains plug!
 The DVB-C/T distribution network must be installed and connected to the equipotential bonding according to EN 60728-11.
 Install the device in compliance with the safety regulations defined by the EN 60728-11 standard.
2.1.

Mounting in a 19" rack

Note: For 19-inch rack mounting, there must be at least 5 cm clearance in front of and behind the unit.
 Slide the device into the 19 "rack.
 Screw the device with four screws (2).
 Install the device in compliance with the safety regulations defined by the EN 60728-11 standard.
Page 10 of 68
BA_MIE.pdf | Technical improvements, changes in design, printing- and other errors reserved. | 2022-05-31

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis