Herunterladen Inhalt Inhalt Diese Seite drucken

HBM C16i Montageanleitung Seite 11

Vorschau ausblenden Andere Handbücher für C16i:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

CAUTION
Position of rotation stop dowel pin:
Radially position open side!
The bore depth ensures correct fitting of the pin. Only one load introduction
part per load cell must be equipped with this pin. This load introduction part
must be mounted below the load cell to enable the dowel pin to engage into the
rotation stop recess (see chapter 8 "Dimensions"). No pin must be introduced
into the bore on the upper load introduction part.
Tip
Please also refer to and comply with the special notes at the end of this chap­
ter.
The areas or foundations below the lower load introduction part (for carrying off
the load) and above the upper load introduction part should be as even and
level as possible.
Practically drill the required borings for securing and fixing on the weighbridge
resp. tank and base plate before you mount the weighing platform. The dimen­
sions for use with EPO3/50t and C16/EPU44A or C16/ZOU44A are as shown
in the dimensioned drawings in chapter 8.
C16i
or
A05516_01_Y00_01 HBM: public
Mounting
9

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis