3.
Left/Right Handrails and Foot Bars
Installation
Place the Rotation Rod (37) into the hole of
the
Handlebar Post
(5). Slide the Left/Right
Handrails (3L, 3R) onto the Rotation Rod
(37) and secure in place with two M8x20
Hexagon Bolts (16), two Ø19.5xØ11.5xδ3.0
Spring Washers (15), two Ø16xØ28x5.0
Washers (14) and two Ø17xØ22xδ0.3 Arc
Washers (38). Tighten bolts with one S6
Allen Wrenches provided.
Attach the Connection Tube (12L,12R) onto
the Left and Right Foot Bar (2L,2R) with two
M10x60
Hexagon
Bolts
Ø10x20x2.0 Flat Washer (22), two M10 Nylon
Nut (8). Tighten bolt and nylon nut with one
S6 Allen Wrench.
Attach the Left and Right Foot Bar (2L,2R)
onto the Crank of Main Frame (1) with two
M8x20
Hexagon
Bolts
Ø19.5xØ11.5xδ3.0 Spring Washers (15),
and two Ø16xØ28x5.0 Washers (14).
Tighten bolts with one S6 Allen Wrench
provided.
4.
Left and Right Handrail Arms Installation
Remove four M6×12 Hexagon Bolts (86), four Φ16×Φ6×1.0 Arc
Washers (85) from the Fixed Handlebar (5). Remove bolts with
S5 Allen Wrench provided.
Insert the Hand Pulse Sensor Wires (44) into the hole of the
Handlebar Post (5) and then pull them out from the top end of the
Handlebar Post (5).
Connect the Extension Sensor Wires (84) to the Hand Pulse Sensor
Wires (44) and Sensor Wire (19).
Attach the Fixed Handlebar (6) onto the Handlebar Post (5) with
removed four M6×12 Hexagon Bolts (86), four Φ16×Φ6×1.0 Arc
Washers (85). Tighten bolts with
Remove four M8×35 Carriage Bolts (32), four Φ16×Φ8×1.5 Arc
Washers (33) and four M8 Cap Nuts (34) from the Left and Right
Handrails (3L, 3R). Remove bolts with one Multi Hex Tool with
Phillips Screwdriver provided.
(20),
two
(16),
two
one S5 Allen Wrench provided.
one