Herunterladen Inhalt Inhalt Diese Seite drucken

Before Commissioning; Installation - Scheppach TBT19Vario Original Bedienungsanleitung

Ständerbohrmaschine
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The specified vibration value was established in accordance with a
standardized testing method. It may change according to how the elec-
tric equipment is used and may exceed the specified value in exception-
al circumstances.
The specified vibration value can be used to compare the equipment
with other electric power tools.
The specified vibration value can be used for initial assessment of a
harmful effect.

7. Before commissioning

• Open the packaging and carefully remove the device.
• Remove the packaging material as well as the packaging and trans-
port bracing (if available).
• Check that the delivery is complete.
• Check the device and accessory parts for transport damage.
• If possible, store the packaging until the warranty period has expired.
ATTENTION
The device and the packaging are not children's toys! Do not let
children play with plastic bags, films or small parts! There is a
danger of choking or suffocating!

8. Installation

Column and machine foot, fig. 3
Set the machine foot (1) down on the ground or the workbench.
1.
Place the column (2) on the base plate so that the holes on the col-
2.
umn (2) align with the holes on the base plate (1).
Screw the four hexagonal screws (17) to fasten the column into the
3.
base plate and tighten them using a hexagon spanner.
 www.scheppach.com /  service@scheppach.com /  +800 4002 4002
GB | 53

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

5806806986

Inhaltsverzeichnis