Herunterladen Inhalt Inhalt Diese Seite drucken

Preparing The Pump; Mounting The Pump On The Base Plate - Steinbach Premium 100 Originalbetriebsanleitung

Doppelstufenfilter
Vorschau ausblenden Andere Handbücher für Premium 100:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Preparing the pump

At the time of delivery, the pump is only partially assembled.
Only hand-tighten all screw connections. Excessive tightening of the screw
connections damages seals and plastic components. Do not use any tools!
1. Place the large O-ring seal
line connection
2. Guide the threaded ring
pump over the line connection.
3. Turn the threaded ring clockwise until
it is hand-tight.
4. Insert the prefilter
5. Place the prefilter cover
pump housing.
Pay attention to the positioning of the recesses on the prefilter cover and pump
housing.
6. Place the auxiliary tool
7. Use the auxiliary tool to turn the prefilter cover clockwise until firmly in place.
The pump is ready for operation. You can now connect it to the lines.

Mounting the pump on the base plate

1. Insert the threaded screws of the
screw set for fastening the pump
from below into the two hexagonal
holes in the base plate
2. Place the pump
so that the threads protrude
13
through the fastening opening in the
pump base.
3. Push the washer and then the serrated
lock washer over the screw thread.
4. Put on one winged screw each and tighten it.
The pump is mounted on the base plate.
52
into the
19
of the pump.
17
of the
18
into the pump.
27
on the
15
into both holes on the prefilter cover.
26
23
.
13
on the base plate
14
4
15
5
14
13
26
19
18
17
23

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis