Herunterladen Inhalt Inhalt Diese Seite drucken

Preparing The Pump; Mounting The Pump On The Base Plate - Steinbach Premium 100 Originalbetriebsanleitung

Doppelstufenfilter
Vorschau ausblenden Andere Handbücher für Premium 100:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Preparing the pump

At the time of delivery, the pump is only partially assembled.
Only hand-tighten all screw connections. Excessive tightening of the screw connections
damages seals and plastic components. Do not use any tools!
1. Place the large O-ring seal
connection
of the pump.
17
2. Guide the threaded ring
the line connection.
3. Turn the threaded ring clockwise until it is
hand-tight.
4. Insert the prefilter
27
5. Place the prefilter cover
housing.
Pay attention to the positioning of the
recesses on the prefilter cover and pump
housing.
6. Place the auxiliary tool
the prefilter cover.
7. Use the auxiliary tool to turn the prefilter cover clockwise until firmly in place.
The pump is ready for operation. You can now connect it to the lines.

Mounting the pump on the base plate

1. Insert the threaded screws of the screw set
for fastening the pump
two hexagonal holes in the base plate
2. Place the pump
on the base plate
14
that the threads protrude through the
fastening opening in the pump base.
3. Push the washer and then the serrated lock
washer over the screw thread.
4. Put on one winged screw each and tighten it.
The pump is mounted on the base plate.
5. Connect the base plate
.
6
The base plate is connected to the filter vessel.
32
into the line
19
of the pump over
18
into the pump.
on the pump
15
into both holes on
26
from below into the
23
.
13
so
13
to the filter vessel
13
1
15
2
14
13
3
26
19
18
17
23

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis