7.1| mounting: Wall
Step 3:
After setting the marks on the wall, remove the wall adapter and pre-drill all four holes on
the mark with the 5 mm drill. Then drill the holes to the final diameter with the 12 mm drill
bit. The drilling depth should be at least 90 mm. Vacuum out the holes well with a vacuum
cleaner or blow them out with a blower.
Step 4:
Carefully tap the dowels into the drill holes with a hammer and place the wall adapter on
the wall. Then insert the screws and tighten them with the ratchet.
51