Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Operation - Atlantic EGEO Betriebs Und Installationsanleitung

Brauchwasser-wärmepumpe - standmodell
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 102
Product
presentation
8.

Initial operation

If the water heater has been tilted, wait at least 1 hour before the initial operation.
For the initial operation, the heat pump will take 5 minutes to start
I.
Turn the power on to the water heater.
II.
Make sure no error code is displayed on the control panel.
III.
Make the settings of your water heater, see section "Setting/Operation".
IV.
In the case of an electrical connection to a Peak hours / Off-peak hours signal, switch the contactor on (I)
(forced operation) to start heating immediately..
52
Installation
Maintenance,
Settings /
Servicing and
Operation
Troubleshooting
Warranty

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis