Herunterladen Inhalt Inhalt Diese Seite drucken

Operating The Router Motor In The Ofl3; Installing And Changing Router Bits - Sauter OFL3.0 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für OFL3.0:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

10. Operating the Router Motor in the OFL3.0

Please observe the safety instructions in this manual before operation.

10.1 Installing and Changing Router Bits

1) Disconnect from the power.
2) Remove the magnetic reduction plates
( 5) using the small recess and raise the
lift up as far as possible.
3) The space is now sufficient to change the
router bit according to the instructions of the
router motor manufacturer.
4) Select the smallest possible reducing plate that suits the router bit diameter
and insert it again. Always plan some space between reducing plate
cutter to ensure chip removal.
NOTE
The tool change is made easier if you place the routing motor at a 45° inclination and
lock it. This gives you optimum access to the union nut and the collet.
Fig 6. Lifting the magnetic plate
Ø max. 55 mm
Fig. 7 Router Bit Max Size
18
( 5 )
(5) and milling

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis