Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Router Motor On The Ofl3 - Sauter OFL3.0 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für OFL3.0:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7. Installing the Router Motor on the OFL3.0

1) Turn the height adjuster
(1) on the lift anti-clockwise until the mounting unit
(9) Has the maximum distance from the insertion plate. This way you get easiest
access to mount the motor.
2) Place the router lift with the operating side down on a firm surface so that the moun-
ting unit
(9) is facing upwards. The mounting unit
(9) itself should not be remo-
ved by itself.
3) Then insert the router motor into the mounting unit
(9). Ensure that the collet
points in the direction of the insert plate
(10), that the collar of the motor is in-
serted by at least 20 mm and that there is a tight fit. Now tighten the mounting unit to
the recommended torque of 13 Nm. Check the correct fit and tightness regularly.
4) Finally, check the full function and usability of the angle adjustment and pivot in order
to detect possible problems before using.
Fig. 3 Mounting the Router Motor
14

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis