Herunterladen Inhalt Inhalt Diese Seite drucken

Main Tain Ing The Hatz En Gine - Ammann ARW 65 Originalbetriebsanleitung

Hatz 1d42 yanmar l100n
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6. Main ten an ce

6.5 Main tain ing the HATZ en gine

Only the main ten an ce work which has to be per for med dai ly
is in clu ded in this ope ra ting ma nu al. Plea se re fer to the en -
gi ne ope ra ting ma nu al and to the main ten an ce in struc tions
and in ter vals lis ted the rein.
6.5.1 Over view
1
Fuel fill ing socket
5
Com bus tion air in take
3
Air fil ter
4
Lock ing screw for wa ter sep a ra tor cham ber
5
Fuel fil ter
6
Oil fill ing socket/dip stick
7
Oil drain plug
8
Oil fil ter
9
Cool ing air in take
10
Cool ing air out let
6.5.2 Fill ing up with fuel
Only top-up by sta tion ary mo tor.
No open fire.
Danger
Do not smoke.
Do not fill-up in closed rooms.
Do not in ha le pe trol fu mes.
Col lect spilt fuel in a suit ab le con tai ner and pre -
vent spil la ge en te ring the soil.
• Park the ma chine hor i zon tally.
• Stop the en gi ne.
• Clean around the fuel filler socket (1).
• Open the fuel filler socket and
• Vi su ally check the fuel level.
• Top-up if nec es sary. All die sel oils sold as fuel and com ply ing
with the fol low ing min i mum spec i fi ca tion can be used: EN 590
or DIN 51601 - DK or BS 2869 A1 / A2 or ASTM D 975 - 1D / 2D
• Close the tank tightly.
65

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis