Herunterladen Inhalt Inhalt Diese Seite drucken

Cleaning And Care; Maintenance; Replacement Of Worn Parts - Bosch Rexroth LG 2/H Montageanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Hot surfaces of the electric motors in operation!
Burns can result from the > 65 °C surfaces.
Provide for appropriate guard devices.
Let the unit cool down at least 30 minutes before performing maintenance
and/or repair work.
• Continuous conveyors which are in motion or in operation may only be inspected
and adjusted once all required safeguards are in place.
• Note EN ISO 13857 when you remove or replace safeguards and/or nullify a safety
guideline.
• Test runs with open panels are only allowed if they are carried out by a competent
person using tip switches and no interference through other switching elements
exists.

10.1 Cleaning and care

Failure of the bearings
Applying grease-dissolving substances to the bearing points, e.g. when cleaning,
leads to the failure of the bearings. There is a risk of damage to property, and the
service life may be reduced.
Keep degreasers or aggressive cleaning away from the bearings!
Clean the product only with a damp cloth.
Failure of the gas pressure springs
Applying grease-dissolving substances to the gas pressure springs, e.g. when
cleaning, leads to the failure of the gas pressure springs. There is a risk of damage
to property.
Keep degreasers or aggressive cleaning away from the gas pressure springs!
Clean the product only with a damp cloth.

10.2 Maintenance

This is a maintenance-free product.

10.3 Replacement of worn parts

Required tools
• Hex key SW13
• Hex socket head cap screw key SW3
• Rubber mallet
• Strainer
Maintenance and repair
CAUTION
NOTICE
3 842 358 734/2015-01, MIT: Liftgate, Bosch Rexroth AG
39/44

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis