Herunterladen Inhalt Inhalt Diese Seite drucken

Transport And Interim Storage; Installation And Electrical Connection - Wilo Isar BOOST5 Serie Einbau- Und Betriebsanleitung

Pumpensystem
Vorschau ausblenden Andere Handbücher für Isar BOOST5 Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
en
5

Transport and interim storage

6
Installation and electrical con-
nection
26
Transport and interim storage
System deactivated
ƒ
System powered and pump running.
ƒ
LED operating in circular mode.
ƒ
System status LED flashing green.
System error/alarm
ƒ
The system is powered and not in operation.
ƒ
Operating LEDs off.
ƒ
System status LED solid red.
When receiving the product, check that it has not been damaged during transport. If
any damage is found, take all necessary measures with the carrier in the time provided.
CAUTION
Risk of material damage
If the delivered material is to be installed at a later date, store it in a dry place and
protect it from impacts and any external influences (humidity, frost etc.). Temperat-
ure range for transport and storage: -30 °C to +60 °C.
Handle the product with care so as not to damage it prior to installation.
All installation and electrical connection work must be carried out solely by author-
ised and qualified personnel, in accordance with applicable regulations.
WARNING
Physical injuries
The applicable regulations for the prevention of accidents must be complied with.
WARNING
Risk of electric shock
Hazards from electric current must be prevented.
WILO SE 02/2021

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Isar boost5-e-3

Inhaltsverzeichnis