Herunterladen Inhalt Inhalt Diese Seite drucken

easydriver infinity 3.5 Montageanweisung Und Bedienungsanleitung Seite 28

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6. Installation, electrical system ž
Unscrew the loose M6 brass nuts from the base
stations. Now connect the motor cables, which are
equipped with ring terminal ends, to the brass screws.
Take note of the connection diagram ‡. Screw the M6
brass nuts onto the screws and tighten to approxi-
mately 9 Nm.
The cables for the motor drive and the brake are
joined in one connector. Attach this connector to the
base station as per the connection diagram ‡. There
is a corresponding marking on the base station.
Caution! Use a suitable sealing compound
to carefully seal the bore holes in the floor
from both inside and outside!
E3
Remote switch
The easydriver is delivered with
an illuminated remote switch. It
should preferably be installed in the
vicinity of the entrance door.
A hole with a 25 mm diameter
is required for the switch. Insert
the cable with the PC-board plug
through this hole from the front. Firmly press the
switch into the drill hole. Glue the dome sticker over
the switch. Lay the cable to the master base station.
Ensure that the cable is not kinked. Connect the PC-
board connector to the master base station as shown
in the figure. There is a corresponding marking on the
base station.
GB6
E4
Connection cable
Connect both base station with the connection cab-
le supplied. The PC-board connectors with the cable
outlet on the left are connected to the master base
station. The PC-board connectors with the cable
outlet in the middle are connected to the slave base
station.
Check whether all cables have been properly laid,
firmly fastened without friction points and safely at-
tached.
E5
Connecting the battery
Caution: Always connect cables to the base stations
and the battery as per their colour coding (red = "+",
black = "-")!
Unscrew the loose M6 brass nuts from the base
stations. Now connect the battery cables, which are
equipped with ring terminal ends, to the brass screws.
Take note of the connection diagram ‡. The strip fuse
(150 A) installed in the red positive (+) cables must
point towards the battery.
Screw the M6 brass nuts onto the screws and tighten
to approximately 9 Nm.
Fit the housing covers onto the base stations.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis