Herunterladen Inhalt Inhalt Diese Seite drucken

Kessel Aqualift F Basic Einbau- Und Bedienungsanleitung Seite 71

Pumpstation
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.8
Fitting the cover plate
Place the seal in the chamber correctly positioned an
grease it.
Put on the cover plate.
Tighten 3 screws, place anti-corrosion protection on
screw heads.
5.9
Leak test
Ensure that the system is de-energised, clean and free of
building debris.
Feed clear water into the system tank until it reaches the
top edge of the system tank (not the extension section).
Check whether there is any moisture escaping at the
inlets, conduit pipe and ventilation pipe, if applicable.
Pump the water out.
If there is any moisture escaping, rectify the cause of this.
Ensure that no moisture can escape.
016-102_01
Pumping station / Installation and operating manual
71 / 144

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis