EN
Installing Landing Gear
Fairings (PKZ5130) may be removed for flying the Extra 300
from a rough runway
1. Press together the landing gear (PKZ5106) legs and put
the landing gear support in the slot in the bottom of the
fuselage (painted bare fuselage, PKZ5167).
2. Release landing gear when support is fully installed in the
fuselage slot.
8
Downloaded from
www.Manualslib.com
manuals search engine
3. Install left (marked "L") and right (marked "R") landing gear
fairings on the landing gear supports and fuselage using
four (4) small screws.