Herunterladen Inhalt Inhalt Diese Seite drucken

Lift Installation With Inclined Pipe Extension (Optio- Nal); Lifting Arm Assembly; Lifting Arm Adjustment - Nussbaum POWER LIFT HF 3000 Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 7
Adjusting of the latch
1
8.3
Lift installation with inclined pipe exten-
sion (optional)
Extension
1. Riser extension is set on the existing riser. The open
side faces inwards.
2. Set to the desired height (from 100 mm to 900 mm
in 100 mm steps) depending on the ceiling height.
Guide the 4 hydraulic lines (fastened to the oper-
ating column) upwards out of the riser.
86
3. Fasten the cover.
1
4. After setting up the lifting columns, lift the
!
cross-connection fastened to the operating col-
umn upwards and fasten to the opposite side.
The hydraulic lines are placed in the cross-con-
nection.
5. Guide the lines from above into the riser of the
opposite side and connect to the colour marked
positions.
6. Fasten the extension using the long screws after
the tensioning plate (A) has been placed.
Extension
A
8.4

Lifting arm assembly

Hang in the standard lifting arm and then place an
acid-free multi-purpose grease into the joint bolts in
each case from above into the hole and then insert
the enclosed locking ring.
8.5

Lifting arm adjustment

After assembly of the lift, the lifting arm may be
placed at the lowest position and become difficult
to move. There is the option of setting the set screw
so that the lifting arms can be moved more easily.
Set screw (lowest lifting rails)
OPI-POWER LIFT HF 3000-4000-HYMAX HF 3000-4000-V1.3-DE-EN-FR-ES-IT
The lifting arm bolts must be secured
on both sides as otherwise a reliable
connection is not given between the
lift rails and lifting arm.

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis