OPERATION

Cylinder replacement during operation
1. Turn the rotary knob
selected as the reserve cylinder!
2. Close the gas cylinder valve of the gas cylinder to be changed.
3. Loosen the connection on the gas cylinder.
4. Connect new gas cylinder.
The gas non-return valve prevents the gas flow from escaping through the free
connection
during cylinder replacement.
5. Open the cylinder valve.Check for leaks.
6. The full cylinder is available as a spare.
7. Perform LEAK TESTING activities.
Type of withdrawal
Operation
Arrow for withdrawal direction on
the rotary knob
"Operation".
Gas is withdrawn from the
changeover regulator
cylinder.
Operating side is empty
Arrow for withdrawal direction on
the rotary knob
operating side.
Pressure gauge of the changeover
regulator
shows "0".
Gas withdrawal now switches to the
central regulator
the automatic changeover valve.
Type of withdrawal
Switching to the reserve side
Manually turn the arrow indicating
the withdrawal direction on the
rotary knob
to reserve.
Carry out the gas cylinder change.
Perform LEAK TESTING activities.
The gaskets at the inlet connections (if provided) must be replaced when re-assembling!
Make sure that the gaskets sit properly in the mounting and that the screws are tightened.
part no. 02 018 51d
as far as it will go so that the gas cylinder to be changed is
Reserve
points to
gas
points to empty
gas cylinder via
Operation
Caramatic BasicTwo
Use
Use
Operation
Reserve
9 / 12