Herunterladen Inhalt Inhalt Diese Seite drucken

Preventative Maintenance; Checklist - Stryker Trio 1033 Betriebsanleitung

Mobile surgery platform
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 52

CHECKLIST

All fasteners secure
Siderails move and latch properly
Engage brake pedal and push on the stretcher to ensure all casters lock securely
Steer function works properly
All casters secure and swivel properly
Body restraints work properly
I.V. pole intact and operates properly
Fowler operates properly
Foot section raises, lowers and latches properly
Trendelenburg/Reverse Trendelenburg operates properly
Lateral tilt operates properly
No rips or cracks in mattresses/Velcro attachments
Ground chain intact
No leaks at hydraulic connections
Hydraulic lift jack holds properly
Hydraulic Trendelenburg cylinder holds properly
Hydraulic drop rate set properly
Hydraulic oil level sufficient
Lubricate where required
Accessories and mounting hardware in good condition and work properly
Serial No.
Completed By:_________________________________
NOTE
Preventative maintenance should be performed at a minimum of annually. A preventative maintenance pro-
gram should be established for all Stryker Medical equipment. Preventative maintenance may need to be
performed more frequently based on the usage level of the product.

Preventative Maintenance

1−20
Date:_____________

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis