.CZ`<<`.HC
.CZ`<<`.HC
d
c
f Route the power cable through the cable entry in the back
panel.
f Hook in the appliance front cover with the heating system at
the bottom.
f Click the heating system into place using the snap fastener.
f Secure the appliance front cover with the screws.
Tap installation
f Fit the tap according to the illustration. For this, observe the
tap operating and installation instructions.
Damage to the appliance and environment
f When making any connections, counterhold them on
the appliance using a size 14 spanner.
Ä
B
Pressure-tested tap
e
10.2.3 Oversink installation, unpressurised, with
Tap installation
f Fit the tap according to the illustration. For this, observe the
tap operating and installation instructions.
Note
f Fit the 3/8 connection hose and the 3/8 tee according
to the illustration.
unpressurised tap
qqq Z`.
<é<`VHC HB