Herunterladen Inhalt Inhalt Diese Seite drucken
Vorschau ausblenden Andere Handbücher für LR 1000 basic:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 9
Support rod:
Screw the support rod onto the LR 1000 basic/control base
with the double open end wrench included with the device
until the end stop is reached.
Installation and connection Pt 100 temperature sensor:
Remove a standard connection NS 14/23 from the reactor
cover for connection the temperature probe.
Screw the LR 1000.61 sensor receptacle with sealing in the
reactor cover.
Pt 100

Setting up

Attach the reactor vessel to the LR 1000 basic/control
base:
Ensure the LR 1000 basic/control is set up on an even, sta-
ble, clean and non-slip working table.
Set the reactor vessel to the LR 1000 basic/control base
carefully and ensure it is properly attached as indicated in
following image.
Fig. 6
CLICK
Plug in the probe and pay attention to the minimum immer-
sion depth and freewheeling of the anchor mixer. Fix the posi-
tion in the housing with the two screws for sliding stop.
Connect the temperature probe with the appropriate socket.
Unlock
Lock
Fig. 7
Fig. 8
35

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Lr 1000 control

Inhaltsverzeichnis