Setting up in the instrument
Place the venting station on a
horizontal surface and insert the gas
washing bottle into the gas washing
bottle holder until it comes to a stop.
Connect the drainage hose (e) to
the throttle valve and the
GL screw joint of the washing
bottle as shown in the diagram.
The tubing is fastened by
closing the GL screw joint.
Now fasten
WARNING
the pressure
tubing (d) to
the venting
head and the throttle valve.
All of the screw joints are
tightened by means of the
SW10 fork spanner (1/4 turning)
which is included in the delivery
quantity.
C 6030_082014
Function
Pour an absorption solution that is suited to your purposes into the gas washing
bottle and secure the ground joints by means of the ground clamp.
Close the throttle valve by slightly turning the adjusting screw in a clockwise
direction.
Note:
Remove the decomposition vessel from the calorimeter and place it into the
venting station. Push the venting head onto the decomposition vessel until it
comes to a stop.
The valve of the decomposition vessel is opened by pressing down the self-
locking eccentric lever.
The venting head cannot be separated from the decomposition vessel
in this state.
d
Check to make certain that the ground clamp fits correctly onto the gas washing
bottle and slowly open the throttle valve.
Take note of any bubble formation and correct in order to achieve the venting
speed desired.
The venting head is removed when the decomposition vessel is completely
expanded (lever in upward position) and the throttle screw is closed again.
WARNING
e
There may be some formation bubbles in the system when
the adjusting screw is hand-tightened with maximum operating
pressure in the decomposition vessel.
The gas washing bottle may be damaged if venting
is performed too quickly.
6