Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Maintenance And Disposal; Special Maintenance - tau T-SKY Bedienungs- Und Wartungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 34
4_
Affix a dataplate on the door, specifying at least the following data: type of automation, name and address of manufacturer (responsible
for commissioning), serial number, year of construction and CE mark.
5_
Compile the automation declaration of conformity and deliver to the owner.
6_
Compile the manual "Instructions and warnings for automation operation" and deliver to the owner.
7_
Produce and supply the owner with the automation maintenance schedule (containing all maintenance instructions for all automation
devices).
8_
Before commissioning the automation, ensure that the owner is adequately informed in writing of all associated risks and hazards.

7. OPERATION

Use of the device for purposes or in circumstances other than as specified in this document is strictly prohibited. Note that this is a mains-
powered automatic device and must therefore be used with caution. The following in particular is recommended:
1_
never touch the device with wet hands;
2_
never pull the power cable to remove it from the socket;
3_
never touch the motor before ensuring it is completely cool;
4_
only move the door when it is completely visible;
5_
perform periodic maintenance;
6_ in the event of a fault, disconnect the power supply and only move the door manually when possible and in safety. Do not intervene on the
door; call an authorised technician for assistance.
7_
never touch any mechanical part during operation;

8. MAINTENANCE AND DISPOSAL

This chapter describes the procedures for drawing up a maintenance schedule and disposal of T-SKY.
8.1 Maintenance
To maintain a constant level of safety and guarantee maximum lifetime of the entire automation, regular maintenance is required.
Maintenance must be performed in strict observance of all safety instructions in this manual and in compliance with current
legislation and standards.
For devices other than T-SKY follow the respective maintenance schedules.
1_
For T-SKY route maintenance is required within maximum six months or 3000 duty cycles from the previous maintenance.
2_
Disconnect all electric power supply sources, including any backup batteries.
3_
Check the condition of all automation materials, with special attention to possible erosion or oxidation of structural parts; replace any
parts that do not guarantee total reliability.
4_
Check the state or wear of all moving parts: belt, carriage, pinions and all door parts; replace any parts if worn.
5_
Reconnect the power supply sources and perform all checks and tests as envisaged in paragraph "6.1 Testing".

8.2 Special maintenance

If more complex operations are required on electro-mechanical parts, the faulty part should be removed to enable repairs in the manufac-
turer's workshop by technicians or other authorised centre.
8.3 Disposal
T-SKY is made up of different types of material; some may be recycled, such as steel, aluminium, plastic, or electric cables, while others must
be disposed of: batteries and electronic boards.
Some components may contain pollutant substances; do not dispose of into the environment.Seek information on recycling
or disposal systems in observance of current and local standards.
1_
Disconnect the automation and any backup battery from the electrical mains.
2_
Disassemble all devices and accessories, in reverse order of the procedures described in chapter "2 Installation".
3_
Separate where possible all parts which may or must be recycled or disposed of differently, for example metal parts from plastic parts,
electronic boards etc.
4_
Sort and assign the separated materials to specialist waster recovery and disposal centres in your local area.
9. NOISE LEVELS
The noise emission level of the T-SKY operator, from the work position, is 52 dB(A).
32

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

K691m

Inhaltsverzeichnis