Installing/mounting
2.4 Sensor Installation Procedure
Figure 2-2
2.4
Sensor Installation Procedure
Pre-Installation Check List
All Sensors are assembled with the final transducers and are mated to the selected transmitter
electronics prior to delivery. The transmitter is pre-programmed with the installation parameters
specific to this Sensor, therefore the installer should verify that the transmitter serial number
matches the transmitter serial number indicated on the Sensor nameplate.
Perform the following checklist before installing the Sensor into the line:
1. Verify that the line operating conditions (flow velocity, pressure, temperature range) and
2. Verify that the transmitter electronics is paired with the serial number listed on the Sensor
3. Check the condition of any pressure taps or Thermowell ports that may be provided with
14
Sample Sensor Label
line MAOP are within the limits specified for the flowmeter.
nameplate.
the Sensor. Install block valves, Thermowell, or plugs as necessary.
WARNING
User is responsible for ensuring that all Sensor ports are properly sealed.
FUT1010 IP65 NEMA 4X & IP66 NEMA 7 Liquid Quick Start
Operating Instructions, 6/2010, A5E02639182A Revision 02