Commissioning

4.1

General requirements

Before commissioning it must be checked that:
● The device has been installed and connected in accordance with the guidelines provided
● Device installed in hazardous location meets the requirements described in chapter 1
4.2
Commissioning
Certain parts inside the device carry dangerous high voltage. The transmitter must be
grounded and the top cover closed before switching the device on.
Confirm that power cables are connected to the appropriate power source (100-250 VAC @
50/60 Hz or 9-36 Vdc).
FUT1010 IP65 NEMA 4X & IP66 NEMA 7 Liquid Quick Start
Operating Instructions, 6/2010, A5E02639182A Revision 02
in chapter 2 Installing/mounting (Page 11) and 3 Connecting (Page 19).
Safety Notes (Page 5).
WARNING
CAUTION
4
29