Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; General Information - ABB VA Master FAM540 Inbetriebnahmeanleitung

Metallkonus-schwebekörper durchflussmesser
Vorschau ausblenden Andere Handbücher für VA Master FAM540:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Commissioning

5
Commissioning
5.1

General information

General information
When using meter with fluids carefully remove the air to prevent gas bubbles.
When using meter with gases increase the flow pressure slowly.
Vary the flow with help of adjustable valves (control valves) to protect the float from pressure
shock waves. Otherwise, the flowmeter may be damaged.
The optional use of gas damping may not be used to compensate for shock waves.
Inspection prior to switching on auxiliary power
Prior to commissioning the unit, check the following:
The wiring is correctly implemented according to the connection diagram, see chapter
"Electrical connection",
The flowmeter is grounded properly,
The ambient conditions meet specifications,
The auxiliary power must match information on the model plate.
Inspection after switching on auxiliary power
After commissioning perform the following step:
Check and configure the measurement parameters according to operating conditions.
22 - EN
VA Master FAM540
CI/FAM540-X1

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis