Page GB-10
Materials required for assembly
Materials required for assembly
Parts list
(1) Exhaust hood
(2) Upper part of the flue screen
(3) Lower part of the flue screen
(4) Exhaust air operation: Exhaust air hose
(5) Exhaust air operation: Check valve
(6) Wall mount for upper flue screen
(7) Retaining plate for lower flue screen
(8) Plate screws 4.0 × 8 mm
(9) Cable ties
Materials required for assembly
You will need:
– Screwdriver
– Drill with stone bit, correctly sized for the
(10), (11), and (12) screws.
(1)
– Measuring tape / ruler
– Level
– Pencil
– Stable stepladder
(2)
– Work gloves
We also recommend having a second person
(3)
with you to help.
Screws
(4)
The screws and dowels required to
mount the appliance on a wall are not
(5)
included in the package contents, as their
type and dimensions will vary depending on
(6)
the characteristics of the wall.
Please have a specialist advise you as to
(7)
which ones you need.
(8)
(9)
In total, you will need
– 2 round-head screws (10) to attach the wall
mount (6) for the upper flue screen (2)
– 2 round-head screws (11) to hang the ex-
haust hood, maximum ø 4 mm
– 2 round-head screws (12) with flat washers
to secure the exhaust hood (1), maximum
ø 4 mm
– 4 suitable dowels
(10)
(11)
(12)