Materials required for assembly
Parts list
(1)
Exhaust hood
(2)
Upper part of the flue screen
(3)
Lower part of the flue screen
(4)
Exhaust air operation: Exhaust air hose
(5)
Exhaust air operation: Check valve
(6)
Wall bracket for upper flue screen
(7)
Retaining plate for lower flue screen
(8)
6 plate screws 4.0 × 8 mm
(9)
Cable ties
Materials required for assembly
Tools and aids
You will need:
– Screwdriver
– Drill with stone bit, correctly sized for the
screws (10), (11) and (12).
(1)
– Measuring tape / ruler
– Level
– Pencil
– Stable stepladder
(2)
– Work gloves
(3)
We also recommend having a second person
with you to help.
(4)
Screws
(5)
The screws and wall plugs required to
mount the appliance on a wall are not
included in the package contents as their type
(6)
and dimensions will vary depending on the
(7)
characteristics of the wall.
Please have a specialist advise you as to
(8)
which ones you need.
(9)
In total, you will need
– 2 round-head screws (10) to attach the wall
mount (6) for the upper flue screen (2)
– 2 round-head screws (11) to hang the ex-
haust hood, maximum ø 6 mm
– 2 round-head screws (12) with flat washers
to secure the exhaust hood, maximum ø 6
mm
– 4 suitable wall plugs
Page EN-11
(10)
(11)
(12)