Herunterladen Inhalt Inhalt Diese Seite drucken

Mechanical Installation; Description Of The Interface; Voltage Supply; Channel 2 - KEB COMBIVERT F5 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für COMBIVERT F5:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EnDat at Channel 1
2.4

Mechanical installation

All kind of works on the inverter may be carried out by authorized personnel in accordance
with the EMC and safety rules only.
• Switch inverter de-energized and await capacitor discharge time
• Pull off operator
• Remove plastic cover
• Remove fixing bolt
• Fix interface board beginning from the socket connector straightly
• Screw in fixing bolt
• Attach plastic cover
3.

Description of the Interface

3.1

Voltage supply

Figure 3.1
U
24 VDC Internal voltage supply of COMBIVERT.
int
I
120 mA
int
Control terminal strip (X2A) of the COMBIVERT with
U
ext
external voltage supply 24...30 DCV.
Voltage output of encoder interfaces X3A and X3B for
24 V
encoder supply.
Current I
put, as well as at the 7,5V-output in accordance with the
following formula:
I
24V
I
300 mA
5V
3.2

Channel 2

The description of input X3B is depending on the used encoder interface. It is described in
a separate manual.
GB - 6
Voltage supply of control and encoder interfaces
at Hiperface, Sin/Cos, EnDat, SSI-Sin/Cos
and UVW.
reduces itself by draw current at the 5 V-out-
int
5,2 V x I
I
= I
-
–––––––––
int
U
24V
at Hiperface, Sin/Cos, EnDat, SSI-Sin/Cos
and UVW.
5V
int
X2A
Uext
X3A
24V
5V
X3B
5,2V
5V
24V
U
int

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis