Herunterladen Inhalt Inhalt Diese Seite drucken

Installation And Start-Up; Mechanical Installation; Electrical Installation - KEB COMBIVERT F5 Installation Und Inbetriebnahme

Vorschau ausblenden Andere Handbücher für COMBIVERT F5:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation and Start-up

2.
Installation and Start-up
2.1

Mechanical Installation

All kind of works on the inverter may be carried out by authorized personnel in accordance
with the EMC and safety rules only.
• Switch inverter de-energized and await capacitor discharge time
• Pull off operator
• Remove plastic cover
• Remove fixing bolt
• Fix interface board beginning from the socket connector straightly
• Screw in fixing bolt
• Adjust desired supply voltage with DIP-switch
• Attach plastic cover
2.2

Electrical Installation

Connector cable of the incremental encoder simulation at socket X3B
Socket X3B (Servo/FI 1)
5
12
4
3
2
1
9
8
7
6
GND
A+
1
A -
6
B+
2
B -
7
N+
3
N -
8
COM
9
Connect-up
external shield at
the respective
connector housing
Socket X3B (Servo/FI2)
5
4
3
2
1
9
8
7
6
GND
Core colour
1
A+
6
A -
2
B+
7
B -
3
N+
8
N -
9
COM
green
yellow
blue
red
gray
pink
white

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis