Herunterladen Inhalt Inhalt Diese Seite drucken

Donauer High Efficiency 3.0 Bedienungsanleitung Seite 59

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

8.7.2
Operation
742.641 | 11.43
Starting initial commissioning
√ The start page for initial commissioning is shown on the
display.
Press SET for a longer time. The next page is displayed.
Selecting a language
1. Press  to select a language.
2. Press SET briefly. The language is adopted.
3. Press SET for a longer time.
Setting the date
1. Press  to select a date format.
2. Press SET briefly. The date format is adopted.
3. Press SET for a longer time.
4. Press SET briefly. The day flashes.
5. Press  to change the day.
6. Press SET briefly. The change is adopted.
7. Press . The month is selected.
8. Repeat steps 4 to 6 for the month.
9. Press . The year is selected.
10. Repeat steps 4 to 6 for the year.
11. Press SET for a longer time.
Setting the time
1. Press  to select a time format.
2. Press SET briefly. The time format is adopted.
3. Press SET for a longer time.
4. Press SET briefly. The hour flashes.
5. Press  to change the hour.
6. Press SET briefly. The change is adopted.
7. Press . The minutes are selected.
8. Repeat steps 4 to 6 for the minutes.
9. Press SET for a longer time.
EN
57

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

High efficiency 3.6

Inhaltsverzeichnis