Herunterladen Inhalt Inhalt Diese Seite drucken

Troubleshooting; Eu Declaration Of Conformity - Scheppach C-Rbp2000-X Originalbetriebsanleitung

Akku-regenfasspumpe
Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

15 Troubleshooting

The following table shows fault symptoms and describes remedial measures in the event of your product failing to work
properly. If you cannot localise and rectify the problem with this, please contact your service workshop.
Fault
Fault indicator flashes red
Fault indicator flashes yellow
Pump does not start
The product slows down during
operation/pressure decreases
Water continues to run after the
pump is switched off
Water runs out of the hose aera-
tor

16 EU Declaration of Conformity

Translation of the original Declaration of Conformity
Manufacturer:
Scheppach GmbH
Günzburger Straße 69
D-89335 Ichenhausen
We declare under our sole responsibility that the product
described here complies with the applicable directives
and standards.
Brand:
SCHEPPACH
Art. designation:
Cordless rain barrel pump -
C-RBP2000-X
Art. no.
5909412900
EU directives:
2014/30/EU, 2006/42/EG, 2011/65/EU*,
* The object of the declaration described above fulfils the
regulations of the directive 2011/65/EU of the European
Parliament and Council from 8th June 2011, on the re-
striction of the use of certain hazardous substances in
electrical and electronic equipment.
26 | GB
Possible cause
Battery too cold/too warm
Dry-running protection active Switch off the product and position the pump so that it
Connection cable not (cor-
rectly) connected
Control unit not completely
closed
Battery not inserted correctly. Insert the battery correctly.
Connection cable not correct-
ly connected.
Battery discharged
Water frozen
Filter clogged
Not enough water
Air in pump or hose
Hose coupling with auto-stop
fitted
Hose clogged/kinked
Connection with hose aerator
not fitted.
Hose aerator clogged
Ball inside the hose aerator is
missing.
www.scheppach.com
Remedy
Warm up the battery/leave the battery to cool down
is completely submerged in water.
Connect the connection cable (correctly).
Close the battery cover and fasten the locking clip.
Insert the plug fully into the socket and secure it with
the cap nut.
Charge battery
Remove the pump and wait until the ice has melted.
Remove and clean the filter.
Check the water level and ensure that the pump is
completely submerged.
Run the pump until the water flows evenly.
Replace hose coupling with one without auto-stop.
Check the hose for blockages and kinks and remove
them.
Fit connection with hose aerator
Clean the hose aerator
Remove the cap, insert the ball and close the cap.
Applied standards:
EN 60335-1:2012/A16:2023;
EN IEC 60335-2-41:2021/A11:2021;
EN 62233:2008;
EN 55014-1:2017/A11:2020;
EN IEC 55014-1:2021;
EN 55014-2:1997/A2:2008;
EN IEC 55014-2:2021;
Documentation authorised representative:
David Rümpelein
Günzburger Str. 69
D-89335 Ichenhausen
Ichenhausen, 14.01.2026
Simon Schunk
Division Manager Product Center
Andreas Pecher
Head of Project Management
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

5909412900

Inhaltsverzeichnis