Herunterladen Inhalt Inhalt Diese Seite drucken

Unit Operation; Battery Installation - Spengler Neotens Nomad Neo100 Gebrauchsanweisung

Handgelenk-blutdruckmessgerät
Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 132

UNIT OPERATION

Battery Installation

Slide battery cover off as indicated by arrow.
Install 2 new AAA alkaline batteries according to polarity. Close battery cover.
Note:
1) Replace batteries when "
2) Batteries should be removed from device when not in operation for an
extended period of time.
3) If the batteries inserted in the device appear damaged or leak, the user shall
take precautions before touching them.
" blinks on screen.
MANUEL UTILISATEUR NEOTENS NOMAD | WWW.SPENGLER.FR
EN
57
Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis