Installation
• The ventilation openings must not be covered over (minimum distance from
other external attachments: 100 mm).
• Follow the vehicle manufacturer's guidelines when installing the system and
establishing the electrical connections.
I
NOTE
After installation of the system, the pre-set parameters on the system software
must be checked (chapter "Configuring the system software" on page 14).
7.2
Creating the opening (if necessary)
I
NOTE
To simplify the task of creating the opening, there is a template integrated in
the packaging of the installation kit.
➤ Create an opening measuring 505 mm x 500 mm with rounded corners with
a radius of R25 (fig. 6, arrow = forward direction).
I
NOTE
Dispose of all waste materials separately. When doing so, follow the waste
disposal requirements applicable in your local area.
7.3
Removing the roof hatch
Proceed as follows (fig. 7):
➤ Remove all screws and fixings for the existing roof hatch.
➤ Take out the roof hatch.
➤ Remove the sealant around the opening so that the surface is clean and free
of grease.
I
NOTE
Dispose of all waste material, glue, silicon and seals separately. When doing
so, follow the waste disposal requirements applicable in your local area.
7.4
Preparing the unit (RTX1000/2000 only)
A
NOTICE! Damage hazard
When preparing the unit on the work surface, make sure it is secured against
falling off.
Make sure that the work surface is clean and level to ensure that the unit is not
damaged.
10
CoolAir
EN