Herunterladen Diese Seite drucken

Grundfos DPK Montage- Und Betriebsanleitung Seite 12

Vorschau ausblenden Andere Handbücher für DPK:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 33
11. Electrical connection
The electrical connection must be carried out in
accordance with local regulations.
Warning
Before installation and the first startup of
the pump, check the condition of the cable
visually and measure the cable resistance
to avoid short circuits.
Warning
The pump must be connected to a mains
switch with a minimum contact gap of 3
mm in all poles.
The classification of the installation site
must be approved by the local fire-fighting
authorities in each individual case.
Grundfos control boxes, pump controllers
must not be installed in potentially
explosive environments.
Make sure that all protective equipment
has been connected correctly.
Fig. 7
Wiring diagram, DOL starting
Fig. 8
Wiring diagram, star-delta starting
12
The supply voltage and frequency are marked on the
pump nameplate. The voltage tolerance must be
within - 5 %/+ 5 % of the rated voltage. Make sure
that the motor is suitable for the power supply
available at the installation site.
All pumps are supplied with 10 m cable and a free
cable end.
Pumps with sensors must be connected to a GU01
or GU02 pump controller. See fig.
connected pumps or fig.
pumps. For further information, see the installation
and operating instructions for the selected control
box or pump controller at www.grundfos.com.
7
for DOL-
8
for star-delta-connected

Werbung

loading

Diese Anleitung auch für:

Dpk.v