Herunterladen Diese Seite drucken

ITT WEDECO Aquada Installations- Und Wartungsanleitung Seite 17

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Alarm 4
• Normal UV lamp ageing (disinfection is still given)
• Cleaning could be required soon
• Lamp filament wiring is in front of the sensor window
» Normal operating conditions can be restored by cleaning the unit
» In the display „HI" is replaced by „LO" (only Maxima)
» Turn transparent lamp connector by 45°
Alarm 5
• End of lamp life in 30 days
» Order new UV lamp
All alarm messages are also given acoustical. The acoustical signal can be
reset by pressing the RESET button.
4.2. New Start after Replacement of UV Lamp
The quartz sleeve and sensor should be cleaned
after each replacement of the UV lamp. The reactor
should be cleaned when necessary.
For the new start of the system proceed in the same
way as for first commissioning. When you press the
RESET button (press for 10 sec.), directly after swit-
ching on, the day counter is reset to 365 and the
unit is newly initialized.
17

Werbung

loading