Herunterladen Diese Seite drucken

ITT WEDECO Aquada Installations- Und Wartungsanleitung Seite 10

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

2.1.2.2. Fitting of UV Sensor
In our factory the UV sensor has been fitted to the control (only for Maxima model).
It is only to be screwed to the reactor. Tightening should be carried out with a light
tool only. A starting torque of 5 Nm is sufficient. Make sure this torque is not excee-
ded, otherwise the quartz glass in the sensor may be damaged.
NOTE:
The sensor is to be cleaned in regular intervals depending on the water
quality. For this purpose unscrew sensor after it has been depressurized
and is free from water, and then clean the quartz glass with the cleaner.
To avoid breakage, do not remove the quartz glass plate (located in the sensor)
when cleaning it. The glass plate should only be cleaned with a soft, clean cloth.
2.1.3. Connection to the Water Line Network
• When carrying out the connection to the water line network make sure to fit stop
valves on the inlet and outlet of the reactor to make maintenance easier
• UV resistant material is to be used for the connections to the water line network.
For the connection sizes please refer to the table in section 2.1.
• The connection to water line network is to be carried out in accordance with the
national regulations
• A solenoid valve is offered as an optional (Proxima, Maxima). This prevents wa-
ter flowing through in the case of power failure or insufficient UV intensity in the
reactor
10
UV sensor

Werbung

loading