Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Risks And Hazards; Procedure; Mounting The Ceramic Cladding - Austroflamm Perry Betriebsanleitung

Vorschau ausblenden Andere Handbücher für Perry:
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

9 | Installation

9
Installation
Installation must only be carried out by an authorized specialist company.
Before installing the hybrid stove, check that all movable parts are working. Any defects before the in-
stallation of the hybrid stove must be reported.
9.1

Risks and hazards

Protective equipment
9.2

Procedure

9.2.1

Mounting the ceramic cladding

Fig. 8: Opening the hopper
Fig. 9: Undoing the screws
22
EN
Safety gloves
1) Open hopper lid.
2) Undo screws.
Operating manual Perry

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis