Herunterladen Inhalt Inhalt Diese Seite drucken

Miele PTD 901 Betriebsanleitung Seite 62

Vorschau ausblenden Andere Handbücher für PTD 901:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
|
|
English
5
Commissioning
Requirements for on-site installation
Inlet water connection
Location
Construction
Inlet water temperature
Water quality
Water hardness
Water flow pressure
Max. inlet pressure
(back pressure)
Flow rate
Waste water connection
Location
Dimensions
62
approx. 500 mm above finished floor; to the right of the machine
Isolation valve with G ¾" external thread
PTD 901,
PTD901 Lift
PTD 901 ECO,
PTD 901 Lift ECO
Microbiologically, fresh water must be of drinking water quality
PTD 901,
PTD901 Lift
PTD 901 ECO,
PTD 901 Lift ECO
PTD 901,
PTD901 Lift
PTD 901 ECO,
PTD 901 Lift ECO
1000 kPa (10,0 bar)
min. 4 l/min
approx. 650 mm above finished floor; left or right of the machine
Ø 40 mm or 50 mm with trap
|
12020321/01; 2023-07
max. 60°C
max. 20°C
Machines without integrated
softener
≤ 3 °dH (3.8 °e / 5.34 °TH / 0.54
mmol/l)
Recommended, to prevent ware-
washer from scaling up.
≤ 3 °dH (3.8 °e / 5.34 °TH / 0.54
mmol/l)
Connection of osmosis water is not permitted due to the copper
pipes in the waste air heat exchanger
100 kPa (1,0 bar)
150 kPa (1,5 bar)
|
Machines with integrated softener
≤ 31 °dH (37.6 °e /
53.4 °TH / 5.35 mmol/l)
≤ 20 °dH (25.1 °e /
35.6 °TH / 3.58 mmol/l)
Operating instructions

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ptd 901 liftPtd 901 ecoPtd 901 lift eco

Inhaltsverzeichnis