Herunterladen Inhalt Inhalt Diese Seite drucken

Minimum Requirements; Options; Operation - haacon ESP Serie Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Braking torque m
[nm]
FD 15
40
FD 15
FD 55
55
FD 06S
60
FD 56
75
FD 06
100
FD 07
150
FD 08
250
Brake delay with interruption on AC side and
t
=
external power supply.
2
t
=
Brake delay with interruption on AC and DC side.
2c
The specified values t
and t
2
to the maximum braking torque, with medium air gap and
rated voltage.
Observe deviating documentation with special versions.
Procedure –>User manual of the motor manufacturer
–> Chapter Brake connection.
Allocation gear to winch –> Spare parts lists.
z Check the direction of rotation of the rope drum before
initial use. The labelling of the controls (up/down) must
result in the appropriate effect. In case of deviation,
check the rope run-in or change the direction of rotation
of the motor. it is not possible to change the direction
of rotation at the mains connection on winches with
230 VAc motor. With the other winches, the direction
of rotation of the motor can be changed by changing the
phase position at the mains connection.
Direction of drum rotation –> see chapter 3.

5.2 minimum requirements

Rope winches must correspond to the requirements of the
valid international and national standards and guidelines.
It is required in particular that:
– Winches are equipped with lifting and lowering limiters
(Limit switches).
– Rope intake positions in the work area of the operating
personnel and in the traffic area are safeguarded.
– Winches are equipped with overload protection, if jamming
or trapping of the load cannot to be prevented and recogni-
zed and forces thereby occur, which overload the winch.
An overload protection is required starting from a load-car-
rying capacity of 1000 kg or a towing force of 10 kN.
– Winches are provided with an emergency stop function.
– Control equipment for initiating and stopping the move-
ment are equipped with an automatic reset.
– Control equipment for lifting (reeling the rope) and lowering
(unreeling the rope) is available and reciprocally locked.
– Slack rope formation does not cause in the endangering
conditions.
– The load carrying capacity is clearly recognizable for the
user.

5.3 Options

haacon mounts the limit switches for options. All switches are
connected, wired and checked, if the control unit has been as-
sembled in the factory. Fine adjustments must be carried out
on-site according to the operating conditions (Chapter 8).
In all other cases, the operator is responsible for wiring the
options correctly.
094414_a_de_gb_fr_eseilwi_s
Brake time
b
t
[ms]
t
[ms] [W]
2
2c
170
20
45
170
20
45
220
25
55
250
20
65
250
20
65
200
25
65
350
30
100
pertain to a brake calibrated
2c
haacon hebetechnik gmbh – Telefon +49 (0) 9375 - 84-0 – Fax +49 (0) 9375 - 84-66

6. OPERAtiOn

P
The safety instructions specified in Chapter 2 apply.
– Always work with the consideration of safety and risks.
– Never overload the winches
– When changing the rotation direction of the motor wait until
it has come to a standstill.
– Observe duty cycle (type plate, technical data in Chapter 3.3).
For example 40% ED (according to VDE 0530) means,
that the motor can operate for 4 minutes during a period
of 10 minutes. It is thereby irrelevant how heavy the load is
and whether the 4 minutes are consecutive or in intervals.
S2-15 min. means that the motor can run continuously for
15 minutes, afterwards however must cool down to the
ambient temperature.
– The load must be safely suspended in the load carrying
equipment and both must be safely hooked into the load
hook and be located on the base of the hook. The safety
catch of the hook must be closed.
– Always initiate load movement with lowest speed. First
tension the rope, it may not be slack at the beginning of the
load movement.
– Continuously observe load during the movement.
– Pay attention to rope damages. Immediately report defects
to the responsible person. First repair defects, then conti-
nue working.
– Carry out required examinations and observe maintenance
intervals.
Control elements:
Lifting / reeling the
rope
Lifting / reeling the
rope
(slow / fast)
Pressing initiates the movement, releasing stops it.
Operation of the options see Chapter 8
GB
GB
GB
Lowering / unreeling
the rope
Lowering / unreeling
the rope
(slow / fast)
23

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Esp245-3Esp245-5

Inhaltsverzeichnis