Herunterladen Inhalt Inhalt Diese Seite drucken

Endress+Hauser OTMT84 Bedienungsanleitung Seite 30

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation instructions
Item B
Procedure:
1.
Open the cover (1) of the field housing (5).
2.
Guide the mounting screws (2) through the lateral bores of the head transmitter (3).
3.
Screw the head transmitter to the field housing.
4.
When wiring is complete (see Section 4), screw the field housing cover (1) back on.
Item C
Procedure:
1.
Press the DIN rail clip (4) onto the top-hat rail (5) until it engages.
2.
Fit the mounting springs onto the mounting screws (1) and guide them through the lateral bores of the head
transmitter (2). Then fix both mounting screws in position with the circlips (3).
3.
Screw the head transmitter (2) to the DIN rail clip (4).
Mounting bracket for wall mounting (wall mounting set available as accessory)
30
Mounting in a field housing
Mounting on top-hat rail (top-hat rail as per IEC 60715)
1 4
0 m
( 5
m
. 5 1
i n )
2 1
m m
( 0
. 8 3
i n )
1 2
0 m
( 4
m
. 7 2
i n )
Dual-input temperature transmitter
6.5 mm
(0.25 in)
A0024604

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis