On each voltage supply cable, a double entry terminal has to be used to insert a second cable needed to make the
bridge.
These terminals and the corresponding crimping tool are usually available worldwide.
Please note that with these terminals, cables of same diameter have to be used.
Two terminals have obviously to be used and the result is shown here below.
A6. Phase shift table (applicable to Base Model)
Three-phase connection (Phase to Phase)
Voltage is measured between L2 and L3
Three-phase connection (Phase to Neutral)
Voltage is measured between L1 and Neutral
STATUS
Approved
Figure 58: Bridge connection
SECURITY LEVEL
Public
PO WER FACTO R CON TR O LL ER RV T
DOCUMENT ID
9AKK107045A9645
REV.
LANG.
PAGE
D
en
80/542
© 2022 Hitachi Energy. All rights reserved.