Herunterladen Diese Seite drucken

Hitachi ABB RVT Installation Und Betriebsanleitung Seite 49

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 161
Progressive
Direct
Normal / Integral (Normal/Int. on the screen)
Normal operation: switches the steps when the demand is continuously present for the whole switching delay time.
Integral operation: switches the steps according to averaged value of the requested reactive power.
Integral operation is useful for applications where the load is varying rapidly.
Q
Switching
delay
STATUS
Approved
Integral =
Normal =
time
SECURITY LEVEL
Public
PO WER FACTO R CON TR O LL ER RV T
+ +
Switching on one step
no step
no step
No switching
DOCUMENT ID
9AKK107045A9645
REV.
LANG.
PAGE
D
en
49/542
© 2022 Hitachi Energy. All rights reserved.

Werbung

loading