Herunterladen Inhalt Inhalt Diese Seite drucken

Installing Power Supply; Switching The Instrument On And Off - Mettler Toledo SevenDirect SD30 Benutzerhandbuch

Leitfähigkeits-messgerät
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

4.3 Installing power supply

Death or serious injury due to electric shock
Contact with parts that carry a live current can lead to death or injury.
1 Only use the METTLER TOLEDO AC/DC adapter designed for your instrument.
2 Keep all electrical cables and connections away from liquids and moisture.
3 Check the cables and the plugs for damage and replace damaged cables and plugs.
NOTICE
Danger of damage to the AC adapter due to overheating!
If the AC adapter is covered or in a container, it is not sufficiently cooled and overheats.
1 Do not cover the AC adapter.
2 Do not put the AC adapter in a container.
The instrument is operated using an AC adapter. The AC adapter is suitable for all supply line voltages ranging
from 100...240 V AC ±10% and 50-60 Hz.
1 Insert the correct connector plug into the AC adapter until
it is completely inserted.
2 Connect the cable of the AC adapter with the DC socket of
the instrument.
3 Install the cables in such a way that they cannot be
damaged or interfere with operation.
4 Insert the plug of the AC/DC adapter into a power outlet
that is easily accessible.
To remove the connector plug, push the release button
and withdraw the connector plug.

4.4 Switching the instrument on and off

Switching the instrument on
1 Press the power switch.
The StatusLight turns on.
2 Wait for 1 - 2 seconds, the screen lights up and displays the startup image.
3 The instrument is initialized. The instrument will be ready for operation in about 25 seconds.
Login screen appears.
Switching the instrument off
1 Press the power switch for 3 seconds.
2 The instrument stops running tasks and shuts down. This process will take some time.
The screen turns off.
12
WARNING
SevenDirect™ SD30

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis