MECHANICAL INSTALLATION

4.1

Important precautions during installation

S
Handle the transducer with care.
S
Welding currents must not be allowed to flow over the transducer. If there is a risk
that this might happen, you must use a suitable low-ohm connection to electrically
bypass the transducer. HBM provides the highly flexible EEK ground cable for this
purpose, for example, that is screwed on above and below the transducer.
S
Ensure that the transducer cannot be overloaded
Notice
Load cells are precision measuring elements and must be handled carefully. Dropping or
knocking the transducer may cause permanent damage. Make sure that the transducer
cannot be overloaded, including while it is being mounted.
CAUTION
There is a danger of the transducer breaking if it is overloaded. This can cause danger for
the operating personnel of the system in which the transducer is installed.
Implement appropriate safety measures to avoid overloads or to protect against the
resulting dangers.
4.2

Mounting

Clamp the load cells firmly at the mounting holes and apply the load at the other end. The
recommended screws and tightening torques are specified in the relevant product data
sheet, available at
Load must not be applied to the side where the cable connection is located, as this would
cause a force shunt.