13. TRACTEL
declines any responsibility for
®
operation of this unit in any mounting
configuration other than that described in
this manual in section 3 "Installation".
14. The unit must be fastened to an anchoring
point and to a structure having the
necessary strength to support the maxi­
mum load (WLL*) indicated on the unit.
If several units are used, the strength of
the structure must be compatible with the
number of lifting units used and with the
maximum utilization load of the
15. The unit is designed for manual operation
and must never be motorized.
16. When using the hoist, constantly make
sure that the load chain is always
tensioned by the load, and in particular,
that the load has not snagged on any
obstacle when lowering as this could
result in rupture of the load chain when
the load comes free from the obstacle.
17. When using the hoist, constantly make
sure that the hand chain and the load
chain do not rub against any obstacle.
18. The unit must never be used for lifting
people.
19. The unit must never be used for any
operations other than those described
in this manual. The unit must never be
used to handle any loads exceeding the
maxi mum utilization load indicated on the
unit. It must never be used in explosive
atmospheres.
20. Never park or circulate under a load.
Mark out and prohibit access to the area
located under the load.
21. When a load is to be lifted by several units,
a technical study must first be carried out
by a qualified technician before installation
of the units. The installation must then
be  carried out in compliance with the
study, in particular to ensure an even
distribution of the load under appropriate
conditions. TRACTEL
pon sibility for the consequences resulting
from use of  a  TRACTEL
bination with  other lifting devices of
another manufac turer.
22. During lifting operations (up or down), the
operator must continuously observe the
load to prevent any risk of snagging.
23. The load chain forms an integral part of the
unit and must not be either disassembled,
repaired or modified without TRACTEL
supervision. Any disassembly or change
units.
declines any res­
®
device in com­
®
®
3
to the load chain without TRACTEL
super vision will release TRACTEL
responsibility resulting from unauthorized
disassembly or modification of the load
chain.
24. The lifting hook forms an integral part of the
unit and must not be either disassem bled,
repaired or modified without TRACTEL
supervision. Any disassembly or change
to the lifting hook without TRACTEL
supervision will release TRACTEL
any responsibility for the consequences
resulting from unauthorized disassembly
or modification of the lifting hook.
25. TRACTEL
declines any responsibility for
®
the consequences of any changes made
to the unit or removal of parts forming part
of the unit.
26. Any disassembly or repair operation
carried out on the unit without TRACTEL
supervision will release TRACTEL
its responsibility for any of the resulting
consequences, especially as concerns
replacement of genuine parts by parts of
another manufacturer.
27. The hoist is only guaranteed by TRACTEL
provided it is equipped with genuine
TRACTEL
load and hand chains as
®
specified in this manual.
28. The unit must be periodically inspected
by  a Tractel­approved repair agent as
indicated in this manual.
29. A servicing handbook must be maintained
up to date in accordance with the model
given at the end of this manual.
30. When the unit is not being used, it should
be stored in a location inaccessible to
persons not authorized to use the unit.
31. In the event of definitive removal from
service of the unit, all environment
protection regulations applicable in the
country of use must be observed.
32. The hoist shall be installed and operated
only in locations that will allow the operator
to be clear of the load at all times.
33. The hoist should be installed in locations
where the length of the load chain will
allow the load hook to rest on the floor or
the lowest level on which the load rests.
*: WLL= Working Load Limit
®