Herunterladen Diese Seite drucken

PeakTech 4395 Bedienungsanleitung Seite 41

2 in 1 dmm/isolationstester

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.2 Fuse replacement
Fuse rarely need replacement and blow almost always as result of
operator's error.
Open the case by unscrewing the 4 screws and replace the blown fuse
with ratings specified.
Caution! Before attempting to open the case, be sure that test leads
have been disconnected from measurement circuit to avoid electric
shock hazard.
For protection against fire, replace fuses only with specified ratings:
F 500 mA/1000 V
All rights, also for translation, reprinting and copy of this manual or parts
are reserved.
Reproduction of all kinds (photocopy, microfilm or other) only by written
permission of the publisher.
This manual considers the latest technical knowing. Technical
changings which are in the interest of progress reserved.
We herewith confirm, that the units are calibrated by the factory
according to the specifications as per the technical specifications.
We recommend to calibrate the unit again, after 1 year.
®
© PeakTech
08/2013/Th
PeakTech Prüf-und Messtechnik GmbH - Kornkamp 32 - DE-22926 Ahrensburg / Germany
+49-(0) 4102-42343/44
info@peaktech.de
+49-(0) 4102-434 16
www.peaktech.de

Werbung

loading