Herunterladen Diese Seite drucken

PeakTech 4395 Bedienungsanleitung Seite 23

2 in 1 dmm/isolationstester

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Do not turn the rotary function switch during voltage or current
measurement; otherwise the meter could be damaged.
Allow the equipment to stabilize at room temperature before taking
up measurement (important for exact measurements).
Do not operate the meter before the cabinet has been closed and
screwed safely as terminal can carry voltage.
Replace a defective fuse only with a fuse of the original rating.
Never short-circuit fuse or fuse holding.
Disconnect test leads or probe from the measuring circuit before
switching modes or functions.
Do not conduct voltage measurements with the test leads
connected to the mA- and COM-terminal resp. mA and MΩ-terminal
of the equipment.
Never touch the tips of the test leads or probe.
Before you perform insulation resistance test, make sure that the
object to be tested is without power.
To avoid electric shock, do not touch the object under test and any
conductor- high voltage !!!
To avoid electric shock, disconnect power to the unit under test and
discharge
measurements.
Do not conduct current measurements with the leads connected to
the V/Ω-terminals of the equipment.
Check test leads and probes for faulty insulation or bare wires
before connection to the equipment.
Please use only 4mm-safety test leads to ensure immaculate
function.
To avoid electric shock, do not operate this product in wet or damp
conditions. Conduct measuring works only in dry clothing and
rubber shoes, i. e. on isolating mats.
Comply with the warning labels and other info on the equipment.
The measurement instrument is not to be to operated unattended.
Do not subject the equipment to direct sunlight or extreme
temperatures, humidity or dampness.
Do not subject the equipment to shocks or strong vibrations.
Keep hot soldering irons or guns away from the equipment.
Do not input values over the maximum range of each measurement
to avoid damages of the meter.
all
capacitors
before
taking
-22-
any
resistance

Werbung

loading